Implementation of the feeder section of Khan Dhari station to the mobile 132/11, which will be installed by the Central Transport Authority within Khan Dhari station.

Project OverviewTo International Specifications This project aims to implement the 132 kV (11 kV) feeder section at Khan Dhari Station and connect it to the new mobile station that will be installed by the Central Region Electricity Transmission Company at the Khan Dhari Station site. Scope of Work: Coordination with the relevant technical authorities to […]
Continue Reading

Concrete fence construction project for Taji camp

Project OverviewTo International Standards This project aims to construct an integrated concrete fence around Camp Taji, enhancing protection and security measures and clearly and systematically defining the site’s external boundaries. The scope of work includes the following: This project contributes to: Providing a robust fence that can withstand harsh environmental and climatic conditions. Raising the […]
Continue Reading

Baghdad Star Residential Complex Project

Project OverviewTo International Standards This project includes the implementation of infrastructure for rainwater and sewage networks, water and electricity networks, road paving, sidewalks, and the design and implementation of parks and main gates. Progress Stages: Actual project completion in 2022. Contract completion has been approved and a preliminary acceptance committee has been formed. Initial acceptance […]
Continue Reading

About one of the implementation projects – Al-Ghazlan Store

Project Name: Al-Ghazlani Military WarehouseImplementing Agency: Wafaa Baghdad General Contracting Company Ltd.Beneficiary: Al-Aws Trading and Contracting CompanyProject Cost: 19,185,910,000 Iraqi Dinars The Al-Ghazlani Warehouse is located in Mosul Governorate and was implemented by a team of specialists from Wafaa Baghdad Engineering Consulting Company, with studies and designs in accordance with technical requirements and international standards. […]
Continue Reading

The parade platform project at the First Military College in Rustamiyah

Project OverviewTo International Standards The project to rehabilitate the parade platform at the First Military College in Rustamiyah was successfully completed in 72 days. The work included improving the platform’s basic structure, adding modern equipment, and updating the exterior appearance to meet military standards. Advanced audio and video systems were installed to enable efficient event […]
Continue Reading

Project to maintain and rehabilitate the water network supplying investors’ projects in the Khor Al-Zubair area.

Project OverviewWith International Specifications The project to maintain and rehabilitate the water supply network for investor projects in the Khor Al-Zubair area aims to improve the infrastructure for distributing feed water (treated or dewatered water for industrial or other use) to various projects located in this industrial area. The total contract value is approximately 716 […]
Continue Reading