{"id":16605,"date":"2025-08-23T08:36:47","date_gmt":"2025-08-23T08:36:47","guid":{"rendered":"https:\/\/wafaabaghdad.iq\/en\/?p=16605"},"modified":"2025-08-27T10:44:48","modified_gmt":"2025-08-27T10:44:48","slug":"%d9%85%d8%b4%d8%b1%d9%88%d8%b9-%d8%b5%d9%8a%d8%a7%d9%86%d8%a9-%d9%88%d8%aa%d8%a3%d9%87%d9%8a%d9%84-%d8%b4%d8%a8%d9%83%d8%a9-%d8%a7%d9%84%d9%85%d8%a7%d8%a1-%d8%a7%d9%84%d9%85%d8%ba%d8%b0%d9%8a%d8%a9","status":"publish","type":"post","link":"https:\/\/wafaabaghdad.iq\/en\/%d9%85%d8%b4%d8%b1%d9%88%d8%b9-%d8%b5%d9%8a%d8%a7%d9%86%d8%a9-%d9%88%d8%aa%d8%a3%d9%87%d9%8a%d9%84-%d8%b4%d8%a8%d9%83%d8%a9-%d8%a7%d9%84%d9%85%d8%a7%d8%a1-%d8%a7%d9%84%d9%85%d8%ba%d8%b0%d9%8a%d8%a9\/","title":{"rendered":"Project to maintain and rehabilitate the water network supplying investors&#8217; projects in the Khor Al-Zubair area."},"content":{"rendered":"\n<p>Project Overview<br>With International Specifications<\/p>\n\n\n\n<p>The project to maintain and rehabilitate the water supply network for investor projects in the Khor Al-Zubair area aims to improve the infrastructure for distributing feed water (treated or dewatered water for industrial or other use) to various projects located in this industrial area.<\/p>\n\n\n\n<p>The total contract value is approximately 716 million Iraqi dinars, and the project includes a 240-day implementation period. This project includes all maintenance and rehabilitation work that will improve the efficiency of the water network, ensuring its use and better serving investors in the future.<\/p>\n\n\n\n<p>Location: Basra &#8211; Khor Al-Zubair<br>Cost: 716,600,000 Iraqi dinars<br>Completion Period: 240 days<\/p>\n\n\n\n<p><\/p>\n\n\n\n<figure class=\"wp-block-gallery has-nested-images columns-4 is-cropped wp-block-gallery-1 is-layout-flex wp-block-gallery-is-layout-flex\">\n<figure class=\"wp-block-image size-large\"><img fetchpriority=\"high\" decoding=\"async\" width=\"506\" height=\"383\" data-id=\"16607\" src=\"https:\/\/wafaabaghdad.iq\/en\/wp-content\/uploads\/2025\/08\/p2-1.jpg\" alt=\"\" class=\"wp-image-16607\" srcset=\"https:\/\/wafaabaghdad.iq\/en\/wp-content\/uploads\/2025\/08\/p2-1.jpg 506w, https:\/\/wafaabaghdad.iq\/en\/wp-content\/uploads\/2025\/08\/p2-1-300x227.jpg 300w\" sizes=\"(max-width: 506px) 100vw, 506px\" \/><\/figure>\n\n\n\n<figure class=\"wp-block-image size-large\"><img decoding=\"async\" width=\"507\" height=\"382\" data-id=\"16608\" src=\"https:\/\/wafaabaghdad.iq\/en\/wp-content\/uploads\/2025\/08\/p3-1.jpg\" alt=\"\" class=\"wp-image-16608\" srcset=\"https:\/\/wafaabaghdad.iq\/en\/wp-content\/uploads\/2025\/08\/p3-1.jpg 507w, https:\/\/wafaabaghdad.iq\/en\/wp-content\/uploads\/2025\/08\/p3-1-300x226.jpg 300w\" sizes=\"(max-width: 507px) 100vw, 507px\" \/><\/figure>\n\n\n\n<figure class=\"wp-block-image size-large\"><img decoding=\"async\" width=\"506\" height=\"382\" data-id=\"16609\" src=\"https:\/\/wafaabaghdad.iq\/en\/wp-content\/uploads\/2025\/08\/p4-1.jpg\" alt=\"\" class=\"wp-image-16609\" srcset=\"https:\/\/wafaabaghdad.iq\/en\/wp-content\/uploads\/2025\/08\/p4-1.jpg 506w, https:\/\/wafaabaghdad.iq\/en\/wp-content\/uploads\/2025\/08\/p4-1-300x226.jpg 300w\" sizes=\"(max-width: 506px) 100vw, 506px\" \/><\/figure>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"507\" height=\"383\" data-id=\"16610\" src=\"https:\/\/wafaabaghdad.iq\/en\/wp-content\/uploads\/2025\/08\/p1-1.jpg\" alt=\"\" class=\"wp-image-16610\" srcset=\"https:\/\/wafaabaghdad.iq\/en\/wp-content\/uploads\/2025\/08\/p1-1.jpg 507w, https:\/\/wafaabaghdad.iq\/en\/wp-content\/uploads\/2025\/08\/p1-1-300x227.jpg 300w\" sizes=\"(max-width: 507px) 100vw, 507px\" \/><\/figure>\n<\/figure>\n","protected":false},"excerpt":{"rendered":"<p>Project OverviewWith International Specifications The project to maintain and rehabilitate the water supply network for investor projects in the Khor Al-Zubair area aims to improve the infrastructure for distributing feed water (treated or dewatered water for industrial or other use) to various projects located in this industrial area. The total contract value is approximately 716 [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":16606,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1],"tags":[],"class_list":["post-16605","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-architecture"],"_links":{"self":[{"href":"https:\/\/wafaabaghdad.iq\/en\/wp-json\/wp\/v2\/posts\/16605","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/wafaabaghdad.iq\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/wafaabaghdad.iq\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/wafaabaghdad.iq\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/wafaabaghdad.iq\/en\/wp-json\/wp\/v2\/comments?post=16605"}],"version-history":[{"count":3,"href":"https:\/\/wafaabaghdad.iq\/en\/wp-json\/wp\/v2\/posts\/16605\/revisions"}],"predecessor-version":[{"id":17169,"href":"https:\/\/wafaabaghdad.iq\/en\/wp-json\/wp\/v2\/posts\/16605\/revisions\/17169"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/wafaabaghdad.iq\/en\/wp-json\/wp\/v2\/media\/16606"}],"wp:attachment":[{"href":"https:\/\/wafaabaghdad.iq\/en\/wp-json\/wp\/v2\/media?parent=16605"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/wafaabaghdad.iq\/en\/wp-json\/wp\/v2\/categories?post=16605"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/wafaabaghdad.iq\/en\/wp-json\/wp\/v2\/tags?post=16605"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}